/

/

Mine Spec Fit-Outs

Mine Spec Fit-Outs

Isolation, lighting and operator safety fit-outs for plant heading onto NSW mining and civil sites.

Certified & Compliant

Safety-Focused Service

Mine Spec Fit-Outs

Site-compliant fit-outs, done to NSW mining standards

From light vehicles to heavy plant, we fit out machinery to
meet NSW mining and civil compliance standards.

Mine site compliance isn’t a checklist you tick once. Specifications change between sites, between operators, and between revisions and the cost of a failed audit is your machine sitting on the gate.

 

Wilsons Plant has been fitting out machinery to mine spec across NSW for years. We work to the site’s standards, not a generic template, and we provide the documentation pack with every fit-out.

Fit-Out Scope

Everything needed to get on site and stay on site

ISOLATION

Isolation & Lockout

Battery isolators, multi-point isolation panels, lockout-tagout points, and emergency stop integration to site spec.

LIGHTING

Lighting & Visibility

Flashing beacons, strobe lights, LED work lights, reverse alarms, camera systems and RPDS all to site approval lists.

CABIN

ROPS / FOPS & Cabin Upgrades

Fitted operator seating, seatbelts, harness points and certified ROPS/FOPS structures.

SIGNAGE

Reflective Tape & Signage

Hi-vis tape patterns, hazard signage, load- rating plates, and operator decals to site visibility standards.

DOCS

Compliance Documentation

Full installation report, certifications, photo records and a compliance pack the site safety team can file directly.

Sites We Work Across

Inducted, approved, and across the spec

We’ve completed fit-outs on light vehicles, heavy vehicles, water carts, service trucks and operating plant for clients working at major NSW mining and quarry sites.

 

That means we already know the site spec books fire suppression brands approved, isolator panels accepted, beacon types specified, RPDS integration requirements so the job moves faster and the paperwork is right the first time.

Site list indicative confirm specific induction status when quoting.

Get a Quote

Fitting out for a new site? Let's scope it properly.

Tell us the site, the machine, and the spec we’ll come back with a costed plan and a delivery timeline.